Cut through Chamise at the beginning of the trail
stumps left after cutting the Chamise
Digging out the trail bed
Rough grading a switchback
Trail bed after construction
Cleared path on future ADA-accessible portion of the trail
John swings a mean Maddock.
Rough graded switchback through rocks
The red segment of the trail was worked on during the March 13 and 15 trips. All the trail bed has been installed in this area.