1-19-09: Mt McKinley peeking through the clouds.
1-21-09: It takes a gentle hand to handle a heavy payload. (That's some of our crew removing the CASCADES-2 main and sub-payloads from their shipping crate).
1-25-09: The Experimenter's performing gravity gradient research with toroidal sensors.
1-26-09: Please don't feed the experimenters.
1-27-09: Wayne adjusting the payload invisibility controller.
1-28-09: PolySwitch device with broken leg on the Lehmacher payload. Our payload has these devices, too. But we ordered the one's without the broken legs.
1-29-09: Jay leading our daily planning meeting where we update our past plans and make new plans for our next planning meeting.
1-30-09: Wayne should not be permitted to have this much fun assembling the PFFs.
1-31-09: Meghan, Dave, and Kevin, reviewing their sheet music before checking their instruments.
2-2-09: The main-payload experiment section was almost ready for sequence testing when these 2 large lizards attacked.
2-3-09: Synchronized stretching at the TM building just before the afternoon payload exercises.
2-4-09: Erik and Steve getting all wound up preparing the COWBOYS sub-payloads.
2-5-09: We were jumping for joy when we found a defective jumper (top item) on the async deck of the PCM encoder.
2-7-09: A beautiful sight: bare cable in the pyro holder.
2-9-09: All eyes on payload assembly.
2-9-09: The payload is fully assembled.