Preparatory work in rooms under church
Flat roof removed from Centenary Room
Rank Hall at handover to builders
Demolition almost complete
Trench digging for archeological survey
Crack repair to church south wall
Preparation for drainage work
Replacing main drain across site
Laying road/temporary parking
Back stairs demolished
Demolition at rear of church
New parking area
Foundations filled
Ground floor construction
Ground-floor construction
Ground-floor walls
Steelwork going in
Steelwork in position
First floor slabs
First-floor steelwork and slabs
Laying first-floor
Unloading
Roof construction
Foyer looking towards entrance
Outdoor area for playgroup
Kitchen servery
Kitchen
Welcome area
Upstairs meeting room
Staircase looking down to entrance
Upstairs corridor
Roof ready for slates
Hall to be added here
Staircase under construction
Welcome area - underfloor heating
Roof looking towards church
First-floor landing and end-wall of church
View through first-floor skylight
Roof of main building completed
Foundation trenches for hall
Hall foundations
First floor meeting room
Round window which inspired our logo
Plinth under hall
Ground floor meeting room G18
Hall building now up to roof level
Welcome Area seen from office
Upstairs meeting room with double-height ceiling
Steelwork for roof of hall
Hall now up to roof level
Hall roof construction
Hall roof and steelwork for windows
Hall interior
Office window onto Welcome Area
Kitchen serving hatch
Roof of hall complete
First-floor meeting room
Meeting room with feature window
First-floor landing
Hall dry-lining
Church preview opening
Mezzanine in Hall storeroom
Hall ceiling
Wooden sports floor in hall