1. required tools: 10 mm wrench, vernier caliper
2. while on center stand, support the bike with a jack or a suitable log so the front tyre does not touch the ground
3/a. measure the initial stock setting, so later you can set it back if needed
3/b. it is 1.45 mm approximately
4. maximum possible raise is about 1.5 inch
4/a. first loosen the lower screws of the fork
4/b. first loosen the lower screws of the fork
5. than the upper ones
6/a. raise both forks to exatly the same height!
6/b. it is 16.4 mm in my case (with spring preload adjuster screws fully uot)
7. tighten the screws in reverse order
8. check the free play of front tyre/fender