urinals and tile
current entrance/inside window detail
front outside detail
The Steam manifold.
View from the DJ booth
DJ Jameson
Room 309, wet paint
Future wet area / washroom
Sound Tubes in the Gym
Sound Tube Sub Woofer
Evid Downstairs
Lower level speakers intalled
Marco, Esai and Abraham, painting crew
The Polara Bulldog pushbutton.
Computer room cooling
DJ Booth paint complete, the plexi windows get installed.
The tinted plexi installed on the window
DJ Booth No Racks yet
DJ Booth, Racks are installed
Future office
Future Hot Tub
main floor electrical, the panel gets moved
Wrapped for your protection
TV Cabinets get installed
shower walls
The lower duct is coming out, cut back to the wall on the right.
shower ceiling, left in near perfect condition after wall demo
future dry sauna
downstairs, future stairway
This is the space under the sidewalk (behind our new stairwell)
1 room and dark area removed
The steel where our new stairs will come through. See those two pipes, that'll cost extra...
supports for concrete cutting
Steam lines moved, floor ready to come out!
Concrete beam at front edge of building
rerouted steam lines
samples for the under bed bins
Rubbermaid yellow bins
Existing steam room / new dry sauna walls
lower floor mechanical room
lower floor wet area, the sink finally disappears
lower floor, the new washroom starts here
The last bits of the front office disappear
Just a mess of wires left.
mechanical chase behind the steam room
new dry sauna
Vending machines will go here...
inside the new office
new office and new doorway
Cutting away the rebar
new steam to sauna doorway
new stairway goes here
steel and re bar cut away
new cut through for the exit vestibule
sewer drains, in back access space
new wet area, dug up for plumbing
existing stairway detail
inside the dry sauna
sauna floor drain
curved wall of the hot tub
wet area door, and curved wall with glass
Front office, the demo continues
old front window comes out
side window stays, but becomes part of new counter (inside)
hole for the new window is cut (the larger section was an old light box that was built but never used, it will be closed in)
exit vestibule, looking into the club
electrical panel, moved and active
plumbing under the toilet stalls
spray foam insulation in the outside wall of the new dry sauna
Outside wall of the office / future locker room, the bump out where the old panel was now gone.
The only remaining section of high wall from the old electrical room.
Trenches are filled
new washroom on lower level
hard to imagine this room will ever be clean again...
looking at the washroom sinks, mirror
Urinals go here...
on the outside of the washroom, looking through the "window"
Looking into the shower, the urinal on the right (with temporary support holding the wall)
pool mechanical space
from the entrance, looking towards the sinks
from the sinks, looking back to the corner shower
plumbing progress downstairs
solving electrical problems.
The office
downstairs stairway walls get boarded
soon there will be a stairway here...
lower floor washrooms, plumbing and door frames
all the new copper to supply the new washrooms
The locker install begins
back of the office wall, locker room on the right
base for lockers
looking toward the dry sauna
cast iron toilet carriers
dry sauna entrance
heading down stairs, sink at the bottom of the stairs
exhaust ducts in the mechanical room
backing for the urinals
the last look at the washroom stalls before they get boarded
the wall behind the bathroom sinks
the other side of that wall
outreach room
fire doors at the bottom of the new stairway
still waiting on a (stairway)
The lockers in ther final positions
end covers and slope tops still to be installed
mechanical room
washroom stalls
showers on the left of the new wet area
doors at the bottom of the new stairway
The cash office starts to close in
MGR office gets a coat of primer
over the half round window to the hot tub area
holes for the pump lines for the hot tub
Inside above the hot tub, showers on the left. The coil of black conduit is for the hot tub lights.
bulkhead around the shower room
aqua board added to close in the space above the steam room
Front desk starts to take shape
A coat of paint in the office.
looking out the office into the cash office
Electrical panel inside the office, still quite a bit of work to do restoring power.
Junction box hell, above the front desk
ready for the stairwell
Junction box hell part two, under the office.
another view of the metal wall
lights in the outreach room
Front desk goes in, ready for the stainless, this is the checkout and transfer counter.
customer side of the front desk
inside the front office
downstairs, the wet area floor also gets a mud job
The shower floor downstairs
washroom floors
Some fresh paint around the front desk
Tiling starts, the dry sauna floor
Towel Bin
waterproofing on the shower floor downstairs
washroom floors downstairs
Answering the question, "how do they get those huge pieces of steel down to position?"
bulkhead lights, and a little color at the front desk
huge sections of stairway, lowered into position.
the skirt wall around the hot tub starts.
In place, but not bolted in yet.
towel return
The stairs come together
Exit vestibule gets new doors
The old front door gets reused as the cash office door, I think it looks good there...
office lights are in, but no power yet...
Some fresh paint in the office
View out the MGR office door
Above the lockers
Tile for downstairs washroom
Structural steel for the hot tub
Lots of headroom for the new doorway
nothing welded yet, just the bolts
The first landing (upper) bolted to the concrete column
View from the lower landing
Lights and power in the office!
more and more cedar in the sauna
Tile floor downstairs
shower floor downstairs
Wall tiles in the lower wet area
Inside the cash office, ready for light switches tomorrow.
View from the gym to the front entry. (the walls above the metal will be painted black, they were originally painted with oil, they just have a primer coat now).
The front desk, view of the customers coming in the front door.
Hot tub stairs
New urinals installed, still some tile repairs to do.
At the bottom of the original stairway.
This is the wall opposite the new lower floor washroom.
stairway cleaned up and gets a coat of paint.
Sun streaming though the front windows makes taking a picture here a little difficult...
Check out / transfer counter, the metal will wrap around the wall on the right (blue now) and end where the gym mirrors start on the opposite side.
The box under the window, at the new stairway.
Light switches, the black switches are for the front desk lights. That blue counter on the right will be trimmed down and covered with stainless.
Gym floor
At the bottom of the original stairway
Stairway blocked while they work above
Lower wet area, tiles almost done!
That's just white primer on the door frames.
the floor problems, at the bottom of the stairway.
Floor leveled, ready for tiling next.
Lights are on, and the start of the benches in the dry sauna
Locker tops, and some paint
Railings arrive, but not fully installed
Steel walls above the original stairway.
front door buttons
Moving into the office, finally!
a little more paint around the locker room
The very last of the red