Trying to organize the several bugs. Coffee paper cups served to sort out the screws and nuts hardware.
The serial number printed on the envelope :-)
Close-up of RF board (1)
Close-up of RF board (2)
Close-up of RF board (3)
Bottom side of RF board
Side panels in place. K3 starting getting shape!
The ATU installed on the back-right side.
Everything in place to assemble the Front Panel.
Bottom side of the front panel board.
Front side of the front panel board.
Bad surprise! The membrane around the red "Freq Ent" button is defective :-(
First power-on test! All works ok!
More boards to install. Ready for the KPA3 and its rear panel to be installed.
A week later after assembly. First impressions running TM8LHC were very encouraging. Now in its operation position :-)