Old building to be demolished
Asbestos siding had to be carefully removed, double bagged, and taken to special area of the county landfill.
The old buildings were demolished.
The next few pictures show the creation on the property of a storm water management reservoir.
Trench for a sanitary sewer line.
Merry Christmas !
Foundations for the first 2 buildings ( of 5 buildings planned).
Framing begins.
Someone hold that ladder !
Under roof.
Shingles added, just before rain storm.
Begin siding.
Wiring installed.
Second floor and pull-down stairs to attic.
Unit 1 drywalled.
Early April, 2009
July 2009
Some of the Thursday Crew
Our first resident - September 2009