Clearing space for Stable 2. Old cow barn (now Stable 1) is on right.
Early stage of construction of Stable 2, March 2007.
Stable 2 on left, Stable 1 on right.
Stable 2, early stage of construction.
This will be the center aisle of Stable 2.
Looking west down the center aisle.
Stable 1 on left, Stable 2 on right.
Stable 2 looking east. Sixteen stalls in this stable, two large tack rooms.
Future entrance to Stable 2.
Horse wash area is in building in near left corner.
Stable 2 taking shape.
Beginning to work on the upper front area.
Roof line emerges.
Steel supports for the roof begin to go up.
April 2007, roof support work continues.
Walls begin to get finished.
Finishing the walls.
Wall and roof work continues.
Progress on walls and roof structure.
Beginning to finish the front walls.
Finishing walls in horse stalls.
Wood to support tile begins to go on roof. Completed Stable 1 is on the right.
Stable 2 in the foreground followed by Stable 1, the Organic Ranch Store and Cafe, and Entrance.
Putting tiles on the roof of Stable 2. View is to the southeast.
Work on the floors of the horse stalls.
Good view of a horse stall and small corral on east side of the stables. Information Center shown top left. Top right is entrance to hiking and horseback riding trails.
Looking south over the stables and ranch store.
Looking west across Stabe 2's roof. Entrance to hiking and horseback riding trails is opening of fence in upper right corner and through the stone walls.
Stable 2 shaping up. There is one tack room on the left and one on the right toward the center of the stable.
Roof work continues.
Looking east. Stable 2 in the foreground, then Stable 2, the Organic Ranch Store and Cafe, Entrance, and Information Center.
Stable 2 construction continues.
Stable 2 roof-work progressing. Inside is nearly ready to be painted.
Roof-work nearly done. Openings are for skylights.
The aisle between Stable 1 on the left and the Organic Ranch Store on the right.
Covered entrance for Stable 2 begins to take shape.
Late May 2007, work on the facade of Stable 2. Inlaying ceramic tiles.
Stable 2 on left shaping up.
Stable 2 (16 stalls), Stable 1 (24 stalls), Organic Ranch Store and Cafe, covered Entrance and Information Center. Lower left corner is the horse wash and groom building. Corrals on the east and west ends of the complex.
Stable 2 straight ahead. The horse wash and groom building is on the left. Stable 1 is on the right.
Aisle between Stable 2 on left and Stable 1 on right.
Stable 2 on left, Stable 1 on right. Stone planters around trees. Stone water trough in foreground.
Stable 1 on right, Stable 2 on left. Hillside on left has been planted with flowers, bougainvillia, which will cascade down the hill.
Entrance to the hiking and horseback riding trails is through the stone walls in the left foreground. Trails go for miles.
Views of the entrance to the hiking and horseback riding trails (up through stone walls), horse wash and groom building, and Stable 2.
Interior of Stable 2 looking west..
Interior of Stable 2 looking east.
A horse stall at the east end of Stable 2.
Interior of Stable 2.
Interior of Stable 2 from west entrance.
This is the east entrance to Stable 2, sort of the back door.
East end of Stable 2, the back door.
From the east ends of Stable 1 on the left and Stable 2 on the right. Room on the near left side is used to process (chop) sugar cane and other food for the horses.