Recent refinishing work on the pews
Window above lounge
Library window
Windows above parking lot entrance
Cloister repair in progress
Note the water damage around the windows
Repairs in progress of the windows and hallway
Additional water damage being repaired
Almost done with the repairs
Cloister repair completed
View of the fence on Anderson Street before painting
Another view of the fence looking towards Sears
The gate before painting
A roofer checking the roof over the nursery
A roofer on the education wing roof
He has no fear of heights
On the roof above the classrooms
Checking the flashing
A major facelift was done to the bathroom near the kitchen recently. Here we are taking down the old tile.
In the process of removing the old tile
The bathroom after removing the old tile
The repaired corner
The completed hallway
The new motion-activated switches recently installed in the 2 upstairs and 2 downstairs bathrooms
The completed bathroom
Another view of the "remodeled" bathroom