Attaching the the steel roof sheathing to the strapping.
Milk paint samples on earthen plaster.
Cheerful workers are rallied to redistribute a large pile of dirt to level the floor.
Appliying the fascia and trimming the strapping.
Finding the centre for the rammed-gravel tire foundation pier for the timber-framed roof support.
Philip and Christine tamp and level the earthen sub-floor.
Kat testing finishes .. on herself.
Preparing to pull electrical cables through O-ring conduit.
Rob mixing the clay-water slip for the first coat of the straw bales.
Chris demonstrates rammed-earth tire technique.
The finished rammed-gravel tire pier with cement cap and steel anchor.
Ryan barbering the bale columns.
The Robs navigate the electrical trench to inspect the hempcrete grade beam