a close up of sheeps wool insulation used to stuff gaps left by the settled hempcrete
Mark installing the bamboo mat soffit
Christine applying a linseed oil finish to the earthbrick floor in the storage room
The earthbrick floor after it has been finished with a coat of pigmented linseed oil
Filling the outdoor stage area with sand to bring it up to the correct grade
A close up of a mushroom that has grown on the outside of the straw clay slip wall
mushrooms on the straw clay slip wall
Lunchtime
A close up of the pigmented and finished earthbrick floor
Annabelle and Christine finishing the floor
Inside the building while the earthbrick wainscotting is being built
Christopher preparing the ground for a course of earthbricks
The rainwater collection cistern
Nick posing with a roofing panel
Kris Beal's amazing siding
Working on the solar pv array
Kayla mixing plaster
Applying a finishing coat of plaster
Chaos on the drystack stone wall
working on the drystack stone wall