Chris and Henry discussing the first round of site soil earth bricks
Pouring sifted soil into the earth block machine
waiting for the first blocks to come out
Tyler installing a sola tube in the roof
putting lathe on the sheer wall so it can be plastered
Kris and Ian putting siding on the storage room
Sifting sand for the plaster mix
Phil roto tilling
Documenting the documentation team
Loading the soil sifter with the skidsteer
Tyler installing a sola tube, Joanne looks on.
The infamous solar hot water bubble pump.
Bob and Joanne working on the roof
Phil and Chris discussing how to lay the runners for the floating floor
Annie purchasing and contracting