Checking the materials
All our kitchen is pulled out for the installations
The hallway is ready
Another view of the beautiful electrical materials
The garage was the main workshop for the electricians
It gets messier. Just a warning to our viewers!
¡AYYYYYYYYY!
Believe me, it gets worse.
Boring job
NOooooooooooooo!!!!!!!
Wire you doing this to me?
¡Kit Chin! Before the “operation”.
ulp
Don't worry; it gets better
Second day; another helper. Sunday they worked 12 + hours
Our corridor, emptied of obstructing furniture
Hole in kitchen wall, for dedicated fridge circuit
The longest job begins with a single jab.
The new poles are taller and thicker.
The "Grabber" in action
Pole Dancer
Cable Dancer
Changing the cables over
Repositioning la lámpara
Flipping the switch back on
How long will this last in a heavy rain?
Wall Walker
Pulling the old post
Up, up!
(A drum roll, please, Maestro!)
¡Con cuidado!
Over the fence
Three of the several posts uphill from our house.