Setting up drill rig to get started.
Drill rig and KC skyline in January.
Paseo Bridge to be replaced.
Terracon geologist Renee Jung logging rock core.
Robert on the barge next to the drill rig.
Some of the shale that was cored in the river.
Robert in the snow.
Terracon's crew working in the snow.
Getting ready for shaft installation.
Getting ready to set the casing for the test shaft.
"Back scratcher" used to prepare the sides of the rock socket.
One of the pumps used for cleanout.
O-cell load frame for test shaft.
The O-cells for the test shaft.
Slurry mixing.
Drilling test shaft.
Preparing for rock socket excavation.
Pumping slurry.
Shale on rock auger.
Drilling bucket coming out of the socket.
Emptying the drilling bucket.
Getting concrete from the bridge.
Concrete placement in the test shaft.
Test frame support in river.
Test shaft during O-cell test.