View from the southwest corner of the site.
Ruth Daoust, Surplus and Recycling Center Manager, walks the outer perimeter of the newly poured wall footings.
Ruth Daoust, Surplus and Recycling Center Manager and Drew Morris, MSU Surplus Computer Technician, look over the progress of the outer wall foundations.
The southwest corner of the newly poured concrete footings for the outer walls of the building.
A look down the west wall of the new facility.
The southwest corner of the building.
The southeast corner of the building showing the footings at the bottom of the wall.
Ruth Daoust, Recycling and Surplus Program Education Manager and Drew Morris, MSU Surplus Computer Technician, look at the wall foundations that will be the outter wall of the Educational Center Conference Room on the east side of the building.
The future site of the Recycling office and Education Center entrance on the east side of the building looking back to the south.
This is a partial cross section of the footings that were injected into the ground to form the basis for the building (see previous albums for details).
The actual WATER (!) mains being run to the new building from Service Road to the new facility.