View from the southwest corner of the site.
Facing East, on the south side of the job site. Looking at the back end of the recycling facility and staging area.
Ruth Daoust, Surplus and Recycling Center Manager, looks over the site. Pictured is the length of the building looking north.
Ruth Daoust, Surplus and Recycling Program Education Manager and Bob Bryan, Surplus Operations Coordinator, look over the progress of construction.
Photo of the south side of the job site, including drainage pipes waiting to be installed.
The west side of the job site looking to the north, pictured is the installation of the storm sewer drains.