This is a photo of the entire length of the western wall of the new MSU Surplus Store and Recycling Center. The far left side is the MSU Surplus Store main receiving docks and the right side is the main MSU Recycling materials processing area.
Pictured from the new MSU Surplus Store and Recycling center is a portion of the poured concrete on the far east side of the site, towards the south end.
Here we can see the start of the screening wall between the MSU Surplus Store and Recycling office portion of the building and the Recycling processing area. Portions of the wall will be comprised of plants and other natural elements (not yet pictured).
A close up of the work of the screening wall that starts at the entrance to the main MSU Recycling office and education center.
Pictured is the interior of the new MSU Surplus Store and Recycling Center bathrooms. The interior walls and stalls have been installed in this portion.
This is the completed interior office for the MSU Surplus Store processing area. The electrical conduits have been routed, the drywall has been installed and insulation has gone in.
This photo is of the interior of the MSU Surplus Store office area. Here will be an enclosed space with multiple offices and workstations for the Surplus staff. Eventually, the last portion of the construction in this area the drop ceilings will be installed.
Pictured here is the MSU Surplus Sales floor looking towards the main customer entrance. HVAC continues to be routed in the ceiling and the font office and public restroom has had its wall framing and electrical conduit being installed.
Pictured here is the MSU Surplus Sales floor looking at the southern wall. Here you can see the recently installed HVAC ducting and the Kelwall windows that will provide natural light to the sales floor.
Here we have the interior offices for MSU Recycling, all electrical and drywall have now being stalled along with the door frames and frames for window walls.
Here we have the back wall of the MSU Surplus Store and Recycling education center. The framing continues in this are and electrical conduit is now being installed.