This is the west side of the new MSU Surplus Store and Recycling Center, pictured is the west wall of the Recycling processing area (right) and the main MSU Surplus Store Docks (left).
Here is the main MSU Surplus Store dock entrance and the outside generators that are found on the west side of the new MSU Surplus Store and Recycling Center.
This is the south east corner of the new MSU Surplus Store and Recycling Center, pictured is the main docks of the Recycling Center (left) and the entrance to the Education Center and Offices (right).
Pictured from the south is the east side of the new facility, work continues as the dock doors are installed and the Kalwall windows are installed over the Recycling Center Offices.
Here we can see the main public entrance to the Education Center and the office area, on the left side. On the right side pictured is the MSU Surplus Store external covered sales area.
Pictured is the east side of the MSU Surplus Store, and the external covered sales area. You can see on the top of the building the openings for the kalwalls that provide light to the sales floor. On the far right side is the main customer entrance to the sales floor.
Pictured here is the main Recycling proccessing area, specifically the sorting pit in the center of the area. You can see the kalwalls have all been installed on the west side of the building and on the other side installation of the dock doors continues.
Here you can see an example of the Kalwall that provides natural light to many places in the building. This particular example is taken from the main MSU Recycling processing area.
This photo was taken from the second floor of the building were the rain water collection system tanks will be located. Here you can see the interior wall framing for the Education Center and Conference room.
On the interior of the building many of the internal wall frames have been installed. Here are looking down the hallway to the public restrooms, to our right is the Recycling Office and to our left is the Education Center and Conference room.
Pictured here is the main offices for MSU Recycling. the floors in this area have been poured and the internal wall framing has begun.
Ruth Daoust, Surplus and Recycling Center Manager and Kris Jolley, MSU Surplus Store Manager discuss the construction progress with MSU Construction Representative Chris Burns and Interior Designer Deena Whitbeck. This photo was taken from inside the Recycling offices.
This photo was taken from inside the MSU Recycling office area, with all of the interior wall framing completed work continues on routing and placing electrical and HVAC ducting.
Here you can see the rain water collection system that is above the Education Center and Conference Room. This was taken from inside the MSU Recycling Offices.
This photo was taken from the second floor of the building looking out onto the MSU Surplus Store processing area. Here the HVAC ducting is still going up.
Pictured here is the interior wall going up that separates the MSU Surplus Store processing area on the left and the MSU Storage area on the right. This was taken looking over the uncompleted wall that separates the storage area and the sales floor.
Work continues on the interior walls, here is the the wall separating the main MSU Surplus Store receiving docks and the Storage area.