Pictured is the length of the MSU Recycling processing area from the east side and on the far right the main public entrance to the Office area.
Pictured is the main receiving docks for the MSU Recycling processing area. The finishing touches are being completed on the exterior venting in this area as the louvers are now partially installed.
Here we have the completed wall screen that separates the the MSU Recycling Processing on the left side and the MSU Surplus Store on the right side.
Here we have a complete photo of the eastern side of the building including the newly installed screen wall pictured here far left.
Here we have the length of the east side MSU Surplus Store (right) and the MSU Recycling offices (left with windows), the main portion on the right side will be the exterior covered exterior sales area for the MSU Surplus Store.
Pictured is the front entrance to the MSU Surplus Store. You can see that there has been some painting on the exterior walls and work continues to finish the roofing over the central office area.
Here we have the exterior corner of the building on the north east side. Here you can see the windows to the front MSU Surplus Store entrance and front offices.
Pictured is the south water retention pond that has seen the installation of the drainage pipes.
Pictured here is the routing of drainage and electrical cables through the MSU Recycling processing area. This is next to the sorting pit found int he center of the processing area.
Here we have the main public entrance to the MSU Recycling Offices and also the office themselves. Drywall and insulation has been installed and work continues with the final details of the HVAC routing systems.
MSU Surplus Store manager Kris Jolley inspects the HVAC installation in the main MSU Recycling Office area.
Pictured here are two of the MSU Recycling offices with the final drywall installation being completed.
Here we can see from the Mezzanine level of the building the public hallway leading to the restrooms and viewing area of the MSU Recycling processing floor.
Again from the second floor mezzanine you can see the entrance to the MSU Surplus Store and Recycling Center education and conference room.
Picture is the main MSU Recycling processing floor taken from the second floor mezzanine. Here you can see the installation of the electrical and drainage for the processing area.
Pictured is the interior offices for the MSU Surplus Store, here the drywall has been finalized and the finishing touches are being installed on the HVAC systems.
Here we have the newly painted west wall of the MSU Surplus Store sales floor.
Pictured is the east wall of the MSU Surplus Store which has recently been painted.