This is the southwest corner of the new MSU Surplus Store and Recycling Center. The siding has been competed and you can now easily see were the Kalwalls will be in the Recycling processing area.
Pictured it the west wall of the MSU Recycling Center processing area. All of the roofing and siding has been completed in this portion.
This photo was taken from the interior of the MSU Recycling processing area. Here you can see were the main dock entrance will be in addition to outside access to compactors. Most the insulation has been competed with small portions still yet to be finished.
Pictured is the MSU Recycling processing pit and on the far side of the photo is the north wall of the processing area where the staff offices are located.
This photo was taken from just inside of the south wall of the MSU Surplus Store processing area. The show the processing area in the immediate foreground, the office area on the right side (where the truck is located), the MSU Surplus Store sales floor on the right back, and also the storage area in the left back. The interior walls separating these areas have not completely gone up but you can see the basic foundations.
MSU Surplus Store Marketing & Sales Specialist James Ives walks the length what will be the MSU Surplus Store sales floor. Much of the work here consists of running electrical, HVAC, and the drainage systems for the rain water collection systems on the ceilings of the building.
This photo was taken from around the center of the MSU Surplus Store sales floor looking south towards the processing area (background left) and the receiving docs (background right).
Picture is the north wall of the MSU Surplus Store, in addition we have the ground level doc entrance that will access the MSU Surplus Store "Sold Area" and Storage.
Pictured is the northeast corner of the new MSU Surplus Store and Recycling center. Here most of the current work is being done on the MSU Surplus Store main customer entrance.
This photo is of the entire east wall of the new MSU Surplus Store and Recycling Center. Our apologies for not having more photos from this side of the building before but much of the work has just been completed on this side of the facility. Here you can see the main customer for the MSU Surplus Store (right), the public entrance to the MSU Recycling office and Education Center (center, to left of yellow area) and finally the MSU Recycling Processing area pictured far left towards the background.
Here is a better detailed picture of the MSU Recycling and Education Center main public entrance. Pictured in the background is the MSU Recycling Processing area.
This photo shows the main public entrance to the MSU Recycling Education Center and office area in addition to the MSU Recycling processing area. You can also see pictured in the foreground left, the foundation for the separating wall that will stretch out to the east from the building.
Picture is what will be the MSU Surplus Store's covered exterior sales area (right) and windows to the MSU Recycling Offices.