Steel framing continues of the Surplus Store side of the facility, trenches are also being run.
Pictured is the MSU Surplus Store receiving docks, framing over the storage facility is mostly completed and cinder block wall have begun to go up in the exterior and interior walls.
This is the Recycling side of the facility, pictured is the trench running the most of the width of the building for the sort line and future expansion.
This is a close up of the trench for the Recycling pit for the sort line.
Picture is the framing over the Surplus Store taken from the Recycling side of the facility.
This is the interior section of the bathroom and hallway between the Surplus Store and Recycling facility.
This photo is taken from the Recycling side of the building looking back to the Surplus Store side, specifically the west corner of the Storage area.
The steel framing of the roof has been mostly completed over the Surplus Store sales floor and storage area.
Picture is the west wall on the north end of the building where the Surplus Storage area will be, cinder blocks have gone up on the exterior and part of the interior walls.
Picture is the south end of the facility were the materials processing, parking and compost will be held. Grating and leveling are being finished.