Work on the MSU Surplus Store and Recycling Center continues as the northern portions of the walls are completed and the retaining walls by the Surplus docks are installed.
MSU Surplus Store and Recycling Center south facing wall with the additional retaining wall on the east end of the building by the Recycling docks.
The MSU Surplus Store and Recycling Center west side of the building, pictured is the MSU Surplus Store receiving Docks.
Pictured is the interior floor of the MSU Recycling Center processing floor, taken from the south side of the building.
The MSU Recycling Center docks now have their retaining walls on each side.
Retaining cubes are being placed for the footings for pillars located in the MSU Surplus Store.
Ruth Daoust, Surplus and Recycling Center Manager and Kris Jolley, MSU Surplus Store Manager walk through what will be the MSU Surplus Store sales floor.
Pictured from the interior of the MSU Surplus Store is the surplus docks, work continues on the outer retaining wall on the west side of the building.
Looking down the interior portion of the west wall on the MSU Surplus Store side of the facility.
Water!! the groundwork has been laid and the water has reached the new MSU Surplus Store and Recycling Center.
The MSU Surplus Store and Recycling Center pictured the norther portion of the building where the Surplus facility is located.
Pictured is the MSU Recycling Center processing floor from the west site of the facility.