The southern portion of the new MSU Surplus Store and Recycling Center taken from the west side of the lot. Pictured is the processing and staging area. Also pictured in the background is work on the Farm Road underpass.
Pictured is the the Recycling side of the new facility, and on the far left is the framing for the Surplus side of the building.
Most of the steel has gone up on the Surplus side of the facility, the left side pictured is the storage side of the building and on the left side the higher portion is over the Surplus sales floor.
Pictured is the MSU Surplus Store receiving docks and past that is the framing for the stores processing area and offices.
The steel framing has mostly been competed on the north west side of the facility which covers the MSU Surplus storage area and the sales floor.
Framing continues on the east side of the building as the framing for the Kal Wall windows. This should offer natural light for the MSU Surplus Store sales floor.
The muddy conditions have not slowed work on the new facility, pictured is the recycling portion of facility. Work continues in the center of the building as the piping and utilities are placed.