The flooring material arrives on a flatbed trailer.
A forklift was rented to move the flooring material. Here's Erik showing off his forklift driving skills.
Off loading the flooring material.
All the flooring material lined up on pallets.
Bags of chipped rubber material.
The glue that holds it all together.
The top coat of material.
Stuff on pallets.
The start of tearing out the floor in the front office. Meanwhile, it's pouring down rain outside.
Unscrewing the wood slats on the floor.
Kyle working hard at communicating.
Lisa removing screws from the floor.
Kyle with two of his favorite tools: pry-bar and claw hammer.
Busting up desk.
More delicate tear-out work.
Remnants of the desk top.
The carnage.
Sledge.
"Would fire work instead of carrying this stuff out?"
Cleaning up.
The mixer for the flooring material.
Workers troweling in the flooring material.
A better look at the mixer and wheel barrow.
The office - cleaned out.
Cleaned out office floor.
The belay room before the new flooring is installed.
The new walkway to the "other side" of the gym.
First layer of rubberized flooring installed in the new rooms.
Continuous poured floor - base layer.
Closer look at the base layer on the floor.
The belay room with the new flooring installed - this is the base layer of three inches. The white pieces on the floor are sections of PVC pipes around the belay anchors on the floor.
Another look at the base layer in the belay training room.
Base layer in the new set of rooms.
More flooring pics of the base layer.
The new slab room with the base layer of flooring installed.
Close-up of the base layer of flooring.
New gym floor in the belay training room - just installed!
Another pic of the new gym floor.
The gym floor in the office - new desk not yet installed.
The new gym floor in the belay room.
Close up of the new floor.
A pooular sign at the gym lately.
We filled this dumpster with junk, debris, and old building materials - and we still have more!