Nike shoe box circa 1986. This is the box that is in need of replacement.
Box ends
Interior partition pieces - 1/4" AC ply
The occupants of the box.
Everything in it's place with extra room. Box is dry fit at this stage.
Box with lid in place. Some detail work left to do. Time to sand!
Interior after finish application and yellowheart trim added. Interior partitions are dark walnut oil, trim and shell are natural. (Watco oil)
Exploded view
Interior partitions.
Good closeup of the yellowheart trim.
Shell assembled and glued, waiting for sanding and a lid.
Latch fabricated and installed.
What keeps the lid closed.
Box shell completed, just need a tray now.
Another shot of the completed shell.
Tray glued up. Joints are splined with redheart.
Tray in the box.
Tray finished, and everything fits. I made the brass springs to hold everything snug when things are closed up
The completed box.
Everything fits. Mission accomplished.