The entryway received its brick this week(end), adding another level of completion to the exterior of the building.
The newly cleaned brick of the parish center gives it a certain gleam.
Interior work continues to evolve. Here, the utility panels are in the process of being installed. In the center (with the cardboard) is the computerized control panel for the HVAC system.
The kitchen walls were painted this week.
Elevator signage makes an appearance.
In the basement, utilities are in place for the radiant heat boiler system.
The area between the parish center and rectory is being graded in preparation for planting new grass.
The rear approach to the parish center got its final grade this week in preparation for asphalt. Elsewhere, the main lot got its final layer.
The garage doors were put in this week. Just in time for winter!
The dumpster surround starts to get a finished look.