Masonry work continues around the front entrance of the new parish center
Shingles are going on all around the building, rain or shine
A close up of the shingles on the 21st St. side of the building.
The hall received more shingle work this week.
The interior entrances received their frames this week. Here, the door to the library is framed by two windows.
With the curb installed around the interior of the circle, more fill is added, and the war memorial (which serves as Mary's pedestal) is returned.