The wall of the hall coat room gets studded in preparation for drywall.
The beam dividing the dance floor from the rest of the hall gets framed in.
A peek inside the kitchen as work continues
A peek inside the kitchen as work continues on the hall.
The last of the bricking is underway on Farragut St.
Elevator components arrived this week, and will be installed over the next couple weeks.
A view out the main entrance of the Parish Center
Decorative bricks arrive onsite. These bricks will be used in the memorial walkway outside the entrance.
Decorative bricks arrive on-site for the memorial walkway. In the center can be seen the wrapped pallet of engraved bricks that were purchased by parishioners.
The newly unobstructed view of St. Stanislaus Church. With the utility poles in front of the church now removed, a much cleaner picture emerges!
A cleaner view of St. Stan's emerges as the poles (small "p") leave St. Stan's.