The office area received its final bricking
Along 21st St, bricking is complete, and the roof is prepped to receive shingles.
Over on the Farragut side, the walls are prepped for bricking.
Curbs, gutters, and light poles continue to be installed, as seen here around the dropoff circle
On 22nd St, the curbs have been installed.
In front of the church, curbs and gutters are taking shape
On the rectory side of the office, exterior walls are progressing
Near the entrance of the Parish Center. Note the brick work.
Inside the Parish Center, interior walls go up.
The office hallway has been erected.
Inside the office, the reception desk is being framed in.
Interior walls are in progress
Inside the Parish Center, interior walls progress.
View of the parish office from the entrance of the Parish Center
The library has been framed in with its walls.
Looking into the large conference room from the main hallway
Looking back from the hall entrance down the main hallway
The office hallway shows all of the rooms defined
Looking into the workroom of the parish office