The roof trusses for the hall are covered with plywood in preparation for receiving their shingles.
View from Farragut St. looking back towards the rectory and hall.
The office section received its trusses this week.
Close up view showing how the trusses attach to the steel structure.
Looking into the hall from Farragut St. HVAC work has started on the interior of the building.
A look into the hall from 21st St. Inside, ductwork pieces are visible.
Looking into the office area from 21st St. showing the HVAC work well underway.
View of the office and hall from 21st St as the office receives its trusses.
View of the office from 21st St, showing the trusses around the front of the building.
Snow fence installed this week would allow students to safely evacuate the school in an emergency.
Current view of the new parking lot; despite the rain, the lot is really coming together! On the left side, snow fence has been erected to protect the students in the event of an emergency evacuation.
The parking lot continues to evolve.
View of the Parish Center from 22nd St.