The new face of St. Stanislaus Kostka Catholic Church, as viewed from Van Buren St.
Clearing of the debris from the high school demolition is progressing rapidly.
Debris from the high school building awaits removal
Demolition crews tackle the base of the high school building, now that the debris from the floors and roof have been mostly cleared.
The crawlspace tunnels from the high school building are revealed.
Steel arrived on site at the start of the week, ready to be hoisted into position!
The stairwell adjacent to the old Grant Street gets its face on. In the background, a crane stands ready to hoist steel into position.
In four short days, the Parish Center goes from basement to steel shell!
Primary beams are in place and ready for steel. To the left, the eastern half of the building sprouts!
View from Farragut of the steel installed for the hall. In the foreground sits the garage door opening. In the background, the steel for the office section can be seen.
BLOG EXCLUSIVE! Aerial view of the status of the steel erection.
The kitchen wall brick is complete.
The kitchen entrance on Farragut.