Birds-Eye View of Proposed Parking Lot
Proposed parking Lot Conditions Before
Proposed Parking Lot
Parking Space Layout
Measuring for Proposed Slab Width
Measuring for Proposed Slab Length
Safety Taping
Layout
Excavation
Cut Existing Asphalt
Auburn City Worker
Double Excavators
Removing Cut Soil
Remove Cut Soil
Prepare Subgrade
Compact Subgrade
Deliver Drainable Base Material
Non Woven Filter Fabric
Install Subbase
Install Overflow Drainage
Impervious Subgrade Infiltration Barrier
Install Side Forms
Setting Side Forms
Completed Subbase
NRMCA PC Technician Certification Training Course
Subbase in place and ready for PC
Securing Infiltration Side Barrier
Michael Hein (BSCI) and Bobby Maddox (AU Facilities)
Dale Fisher trains AU Facilities on new Striker Screed
Dale Fisher Explains
Placing PC
Depositing PC
Strike-off & Compression with Striker Screed
Down the Chute
Fresh Pervious Concrete
Fresh PC on the ground
Auburn City Employees
New Striker Screed works great!
Compacting Edges
Compacting the Edge
Dale Fisher, PCI & students in Prepour Meeting
Dale Fisher Demonstrates Striker Screed
Moving PC around
BSCI Students
Sharing Perspectives
Aggregate Size Distribution
Analyzing aggregate size distribution
Aggregate Distribution
Dale Fisher, PCI - Master PC Craftsman & Trainer
Finishing Touches
Closely watched concrete
Houston Bolt: "You missed a spot!"
An uplifting Explanation
Placing 4 mil Curing Plastic
Compacting Edge
Ben Puckett, City of Auburn
Compacted Edge
Strike-Off & Compress with Striker Screed
Cross Rolling
Cross Roller
Positioning Rolling Jointer
Rolling Jointer
Rolling Control Joint
Rolled Control Joint
Closing Form
Curing Plastic
Cleaning Equipment
Group Photo
Demonstrating Infiltration to Client
Testing Infiltration: Very Fast!
Very Thirsty Concrete!