Correct detailing at window sill of inset panels.
It's okay to leave a 1/4" gap at the bottom of the glavalume for water to exit, but it'll find a way out anyways
MItred corners looks good. We'll revisit whether anything more is needed after California
Note typar wrap complete, ice&water transitions over roof over typar. Cedar will go between patio-sliders and transom
Mitre looks just as good as butt. Butt simpler.
Rinnai vent projects faaaaar. May be good to consider roof vent and flashing kit.
This looks way slicker in real life. A very, very nice detail. Dean wants to use visible stainless screws on the black trespa infill panels - please let's discuss.
The brads are barely noticeable.
We discussed brads and PL for birch ceiling panels. OC switched to screws at seams and T insets - let's discuss.
Kerry's a smart lad, I wonder how he will transition that supply duct to a grill?
These are to be puck lights inset flush in the ceiling. The 10GA wires are very difficult to work with. I suggested transitionining to 10GA brainded wire to be more workable.
Cripple detail will help resist moment of wind up/down-lift forces on solar shading canopies
Larger field of Mondo Natura N92. Note, perimeters have been spray foamed.
Drainage plane is typer to outside of 2x4 alu L angles - perfect. Inside of windows should get caulk - where L-butts to exterior Window frame
The way the gable flashing meets the gutter flashing at the bottom edge of the galvalume roofing.
To make 10GA wires more workable, transition to a smaller wire. This only needed to be 14GA to prevent potential overheat. Just checked run lengths.
Grundfoss pump triggered to run when call made to air handler main blower. Kerry's figuring this out.
Wardrobe trim needs to be able to take wardrobe being taken in/out for MEP/HVAC servicing.
Standard laundry bib installed in wall. There's one in the plumber's box of stuff.
Nice even transition from entry deck to floor.
All in all - it's looking nice.