Approach to site 2008
One of two remaining huts 2008
Northend of Hut 1 2008
Rear of hut one 2008
Brick addition to hut one 2008
Wall thickness of brick addition 2008
Rear (west) wall of brick addition 2008
Interior of brick addition 2008
Rear (west) wall downpipe detail 2008
North elevation brick addition 2008
RN Commando Memorial 2008
Memorial Picture A 2008
Memorial Picture B 2008
Memorial Picture C 2008
Memorial Picture D 2008
Second remaining hut 2008
General view of beach area from SW 2008
Slab believed to be landing at end of Pier 2008
Step believed to be bearer of end of pier 2008
Concrete debris on beach 2008
Brick debris at north of beach 2008
Brick Debris north end of beach 2008
Cast concrete sewage pipe support 2008
Concrete pad in line with sewage pipe supports 2008
Sewage pipe support 2008
Part of sewage system north end 2008
Concrete Debris North end 2008
Site from north end 2008
Path and hut bases 2008
Brick Detail 2008
Large water/sewage tank stone built 2008
Hut bases watertank to right 2008
Brick addition to watertank 2008
Brick pier in watertank 2008
Hut bases 2008
Steps to hut bases 2008
Steps to big hut base 2008
Remains of concrete floor of large hut base 2008
Terraces supposed hut bases 2008
Concrete debris north end 2008
Concrete hut base 2008
More hut bases 2008
All that remains of Glenfinnart House 2008
Hut three from east 2010
Hut three from south 2010
Hut three from northwest 2010
Hut three interior 2010