WORKS SITE TO REPLACE TWO OLD STILES WITH PEDESTRIAN GATES ON MILSTON FPS 1 & 2
THE JOB IS TO REPLACE THESE STILES
DAVID THINKS IT IS A BIT OF A MARE
STILES REMOVED EXCEPT FOR TWO SUPPORT POSTS
ONE GATE IN ROUGH POSITION
THE OTHER NEEDS THE ASHPHALT DIGGING UP
AN AUDIENCE TO VIEW OUR WORK
NORMAN MAKES THE POINT THAT HE IS HARD AT WORK
NOW TO MIX THE CONCRETE
DIGGING A TRENCH IN THE ASHPHALT
CEMENTING IN THE GATES
TAMPING DOWN
DAVID & ALEX PREPARE THE RAILS
FINISHED GATES REQUIRE PROTECTING RAILS AND BARB WIRE FENCING
THE FINISHED JOB
BLOCKED PATH MILSTON FP15, WORK FOR ANOTHER TIME