How our Hospital looked before construction of our new addition
Temporary Hospital ER entrance 12-16-09
Old entrance to Hospital
Open for Business
Temporary Power Panels
Removing sidewalk in front of old hospital entrance
view from current radiology window 12-22-09
12-22-09
up close and personal
last of the sidewalk 12-22-09
The last trees to go ;(
catch basin for the small court yard that is in front of the old entrance
removing the eaves from in front of laundry
heating the frozen ground to get the proper compaction
those lines have 180 degree water running through them thermal blankets to help hold the heat in
chiller fans after replacement from side of garage
central utility plant location (CUP)
TRENCH FOR FOUNDATION CUP BUILDING
LOTS OF HOLES, LOTS OF FORMS
STARTING THE FIRST OF MANY CEMENT POURS
FOUNDATION FOR ATTACHING NEW WING TO EXISTING HOSPITAL
CUP BUILDING FOUNDATION
POURING CEMENT NEXT TO LAUNDRY THE GUY STANDING, CONTROLS THE CEMENT BOOM WITH BOX IN FRONT OF HIM
FIGURING OUT WHERE TO PLACE UNDERGOUND UTILITIES
Under Ground Electrical Service being installed in CUP (central utilities plant)
Close up of CUP utility install
Valves for temporary sprinkler system located outside the temporary hospital entrance
Getting ready to pour the first slab of cement
Boom truck getting ready
First part of pour started in the new Xray office area
CUP
CUP floor
Windows from Laboratory (closest) and last two from Cardiopulmonary that look out into the court yard
Block work and future court yard
Lab and cardiopulmonary area
CT and xray rooms , rebar is for the CT scanner to sit on, needed extra support
surgical and OB area
removing restrooms, and administrative offices
Ken's old office, can see temporary wall on other side of studs. This the other side of the wall that was put outside of the kitchen and laundry area
future court yard looking at the windows in present radiology area
future lab and cardiopulmonary areas
Pizza Party Celebrating the last Concrete Pour The Floor to the new addition is DONE!!!
pizza party
Pizza Party for workers and Employees
Site tour for interested employees provided by Anderson Construction This is the future area for the Acute Nursing rooms
Site tour for interested employees provided by Anderson Construction
Steel girders for the ceiling/floor of the second story addition, corrugated steel with a concrete topping will be added later
Anderson Construction Office
Pouring the concrete roof/floor above new surgery for the second story addition
Getting ready to pour more concrete
Mezzanine pour
Done with the mezzanine pour, covered with tarps
Jon and Scott
Future skylight
Looking Towards Nurses Station from patient hallway in acute care (south to north)
Lab & Cardiopulmonary area
Gordon and Ken's old office's
Old Administrator office
Scott standing in the Lab
Looking towards the CUP from the nurses station Before the walls go up of course!
Stairs leading to the mezzanine
Inside CUP
view from the mezzanine
looking down on the future radiology department
ER
Surgery area
Mike Escaping
Trap door to mikes hide-out
tunnel to cup
tunnel to enter cup
inside cup
inbside cup
water valves
mke on his way to his HIDE OUT
wall inside cup
top of cup
on top of the cup
looking down from the cup
mike's spot for future lawn chair and bbq, on top of the cup building
construction site supply storage
construction site storage
construction site offices
what is left of administrators office
sheet rock required by fire marshall, walled off existing attic from old admin office
old door to business office
inside old admin hallway, sheet rock job, required by fire marshall
wall layout for new radiology room
Looking east
new additon
future radiology office's
court yard looking into present radiology, i am standing at the old front hospital entrance
court yard
hall way connecting new with old
duct work
nurse's station at end of hall, ob to the right and surgery to the left
framing
sky lights
Duct work,
Hot Water heaters in CUP
back up generator
Air handlers in mezzanine area
Inside of air handler, air filters go in here also
more air handlers in mezzanine area
looking down onto future nurse's station from mezzanine area
looking down from mezzanine
equiment in mezzanine
insulation in surgery area
Nurse's station
nurse's station
tile in new patient bathroom
patient room, all painted
acute care wing almost finished
suspended ceiling grid work in surgery area
Gas valves in surgery area
looking up at electrical (silver) gas (copper) and water lines(Black) that need to all come together
It will all fit
New ER entrance
Acute Care wing
Healing Garden looking north towards the new OB wing
back of new acute care wing
Site where it all began last November, the pine trees that were removed, would have been in the middle of the picture
Another picture of ground breaking area
Power panel in CUP
Lots of wires, good thing they are color coded!
Liquid Oxygen tank
New 5000 gallon propane tanke
Radiology office
Radiologist reading area
Ultrasound room
Radiology
CT Scan Room
Xray/CT control room
future pt dressing room
tile on floor of new public hallway
nurse station
pt room
looking out of window from ob room
Surgery lights
surgery
surgery nurse desk
installing new Radiology equipment
ob room
nursery
ER Trauma Bay
Pt. bathroom
Xray equipment