7.01.08 - Future Site of Erie High School
11.03.08 - Equipment on site to start dirtwork
12.10.08
1.7.09
1.22.09
02.05.09
03.02.09
05.18.2009
05.27.09
06.02.09
6.18.09
6.18.09 (from HWY 59)
7.28.09
08.10.2009
8.20.09
11.09.2009 - sides going up on vo-tech building
11.09.2009 - windows being installed
11.09.2009
11.09.2009 - north side of vo-tech building complete
04.13.2010