Landmark Plaza, City of Oshkosh
In conjunction with remodeling of the building facades, the owner undertook a significant upgrade to the storm sewer system and parking lot. Many of the tenants have sustained significant damage as a result of flooding during heavy rains. The parking lot was regraded, the storm sewer was redesigned, and back flow prevention devices were installed at key points in the system to prevent flooding.
Apr 22, 2008
Photos: 10