Building A on the new Chandler campus of Tri-City Baptist Church Ministries
In the south parking lot
Sanctuary
Baptistery in the sanctuary
Pastor Mike looks down from one of the organ sound rooms above the sanctuary
Foyer
Looking south in the foyer
Working hard in the foyer
Jeanna Camp, who is organizing the building's cleaning, Pastor Mike Sproul, Senior Pastor, and Steve Edwards, Maintenance Director
The receptionist desk in the foyer
Furniture and boxes are now being moved into the building for storage
Look southwest in the foyer
Looking southeast in the foyer
A pastor's work is never done
Volunteers are cleaning the building and helping move boxes and furniture
Work is still being done in the sanctuary
A sample chair setup in the sanctuary
View from the stage in the sanctuary
James Yuen, IS Director, gets hands-on with the new building
The kitchen is designed to serve over 1,000 meals per day
Left: Trevor Barchus, Director of Food Services, Steve Edwards, Maintenance Director
Building plans
The gym is currently being used for storage
A locker room
The main hallway on the first floor
Pastor Mike heads into the sanctuary
James Yuen talks with Pastor Mike
Bob Kamp and Steve Edwards
Work continues outside the foyer
The south side of the building
Jeanna Kamp and Maria Wells cleaning
The polished cement floors
A carpeted room
Area of refuge
Upstairs hallway
Some boxes and items have been moved into rooms for storage
A bathroom
5th grade classroom
View from one of the organ sound rooms above the sanctuary
Baptistery
View of the sanctuary from the baptistery
The playground
Volunteers have been helping clean and move boxes and items
A downstairs hallway
Maria Wells cleans a bathroom. Volunteers have been helping clean and move boxes and items.
Sanctuary ceiling
Work continues in the sanctuary
The east end of the building
The north end of the building
The north side of the building