Cabinet that needed to be removed and abated for mold
Old Bathroom area
Wall before it was abated for mold
Jack Hammering Cement, gruling
Dave Coleman, Gayles Brother
I am pooped, I want to relax, but cannot. This is how I spent my 2009 Labor Day Weekend
Diging for drains
Drain Plumbing for Mother In Law new Shower, Sink and..
The studs 5 studs on the right side are being removed and a cooking prep Island will be installed
/this is a mess. I poked a pipe on the Labor Day weekend and had to fix it. Saved a Plumber coming out on a Holiday
New part of the project. Install an entirely new Drain system and remove old underground pipes
Wall that is going to be removed which will open up the Kitchen and Dining room
Footings and measurements for inspection
Completed Labor Day 2009
Completed Footings 30“x30 for new Beam so we can remove this wall and open up the kitchen
Progress Narration Beam Drains September Thursday 10th 2009