The final three more layers of glass (roving and mat) go on both wings.
The combined thickness is now close to 1/2 an inch on all sides of the wings.
These wings are strong enough to hold the full weight of the ship and then some.
Next comes the barrier system then the bottom paint
rudder ready for paint too
The battery box pulled out for access, waiting for one battery strap to complete installation
when put into storage position the box is locked down with a retaining bolt
Mark was not happy with the look on this corner so he added a few more layers
the first layer of the barrier system seals the glass
new prop shaft zinc in pace, the skeg zing goes on after final bottom paint
repair of swim grid nearing completion
first coat of bottom paint. Three coats for new areas then the entire bottom gets a coat just before launch
rudder ready for bottom paint