3/31/2009 Light poles will be installed during the next few days
3/31/09 More Sod
3/31/2009 Day 2 of drywall install
3/31/2009 Plumbing
3/31/09 Plumbing
3/31/2009 Ex-Garden Temple
3/31/2009 Drywall install in progress
3/31/2009 From front foyer
3/31/2009 Door frame installation
3.31.2009 inside West entrance
3/31/2009 A/C ducts being formed
3/31/2009 Drywall (LaForge) made in USA
3/29/09 Floratum sod looks nice
3/29/09
3/27/2009 Vapor shield inside the main building
3/27/2009
3/27/2009 More palm trees planted
3/27/2009 Old garden temple area being made nicer
3/27/2009 Sod placed on grass parking area
3/27/2009 ready for concrete pour
3/24/2009 Some palm trees planted today
3/24/2009 Vapor Shield
3/24/2009 Vent for A/C return air
3/24/09 Opening for door at 2nd floor
3/24/09 metal sheets covering for lower roof, south side
3/24/09 water pipes in front of entrance
3/24/09
3/24/09 under side of foyer
3/24/09 under side of front walkway
3/23/2009
3/23/09
3/20/09
3.20.2009 Underside of covered walkway getting finishing touches
3/20/2009 Roofing in progress
3/18/2009 Striping and car stops done yesterday
3/18/2009 waiting to pour concrete on the space in front of the foyer
3/18/2009 Space reserved for FPL Transformer
3/18/2009 FPL Meter Box
3/18/2009 Markings for special parking areas
3/18/2009
3/18/2009 All windows with impact-resistent glass, installed now
3/18/2009 One section of the parking lot with striping and car stops
3/16/2009 Support for the trusses which will hold the floor of the second level
3/16/2009 Support structure for the tray ceiling; drywall will cover this, providing a paitable surface
3/16/2009
3/16/2009 One of the two windows with glass installed
3/15/2009 Metal roof installation partially done
3/13/2009 Tray ceiling work in progress
3/13/2009 Window frames installed
3/11/09 Curbing
3/11/09 Metal roof pieces
3/11/09 Metal roof sheets
3/11/09 Metal roof installation
3/11/09
3/10/2009 Access from Plantation Road completed
3/10/2009 Grass parking - north
3/10/2009 Grass parking - South
3/9/09 Asphalt Work and connection to Plantation Road, in progress
3/9/09 Electrical fittings under the covered walkway
3/9/09 The camera time is not set for daylight saving time
3/9/2009
3/9/09 Light box and fire sprinkler detail
3/6/2009 Getting ready to connect to Plantation Road
3/6/2009
3/6/2009 Paint work is almost done
3/5/2009
3/4/2009 Painting of outside walls almost complete
3/4/2009 Drainage overflow - rough
3/4/2009
3/4/2009 Painting of outside walls almost complete Columns got one coat; the darker color may get the vote as the second coat
3/4/2009 The dug up area is preparation for FPL transformer
3/3/2009 Crowther Roofing working on the roof above the east covered walkway and foyer
3/3/2009 Crowther Roofing working on the roof above the east covered walkway and foyer - Asphalt melted at 400F
3/3/2009 Always Electric installing light fixtures under south covered walkway
3/3/2009 FPL will supply electric power to the Temple through this newly erected pole
3/3/2009 View from the south side
3/3/2009 Nice view through the pine trees
3/3/2009 Handpainting the bottom edges to avoid spraying paint on the floor
3/3/2009 Crowther Roofing working on the roof above the east covered walkway and foyer. Note the special fasteners thst go through the tar paper into the light concrete base
3/3/2009 Crowther Roofing working on the roof above the east covered walkway and foyer - 3 layers of the tar paper will be installed