2/28/2009 Painting in progress
2/27/2009 Exterior Painting has started
2/25/09 Steel columns dressed up and stucco applied
2/25/2009 All the 5 semi-circular windows have been installed - 3 done today
2/25/2009 Front left view
2/25/09 Restrom changes
2/25/09 Restroom changes
2/24/2009 Interior paint color - 6240 or 6238?
2/24/2009 One of these 4 colors for the exterior walls
2/24/2009
2/24/2009 Short-listed color choices (sample paint is on the walls of the east side of the Temple)
2/24/2009 (sample paint is on the walls of the east side of the Temple)
2/24/2009 one of the two semi-circular windows installed today
2/24/2009 two semi-circular windows installed today
2/24/2009 View from inside of Storage room through one of the three tinted/impact resistant windows installed yesterday
2/23/2009
2.21.2009 Steel columns prepared for stucco
2/21/2009 Women's restroom door opening near west entrance
2/21/2009 Newly cut openings for rest rooms
2/21/2009 Restroom changes in progress
2/21/2009
2/21/2009 Men's room door opening
2/19/2009 Steel columns being decorated
2/19/2009 Stucco finished in east side
2/19/2009 East face of the building
2/19/2009 Steel columns being decorated Southside
2/19/2009
2/19/2009 Steel columns being covered
2/19/2009 Finishing dumpster enclosure
2/19/2009 under roof insulation
2/18/2009 Bathroom modifications - Mop Sink
2/18/2009 Bathroom modifications - Men's room door will be on the north west corner
2/18/2009 20 Steel columns will be dressed like this example
2/18/2009 Storage room door opening waiting for the door
2/18/2009
2/18/2009 Fake windows outside of rest rooms
2/18/2009 Under the roof insulation in progress
2/18/2009 Dumpster pad
2/18/2009 Stucco work in the east front side
2/12/2009 More asphalt work done today
2/12/2009 R19 insulation under the roof, being installed
2/12/2009 Dumpster pad in progress
2/11/2009 Black top asphalt paving in progress
2/11/2009 Electrical work
2/11/2009 Under the front foyer
2/11/2009 Insulation material that will go into the ceiling
2/11/2009 Small concrete slab connecting to the walkway
2/11/2009 Another small concrete slab connecting to the walkway in the back
2/11/2009 Dumpster pad
2/11/2009 Black top asphalt paving - Back side
2/11/2009 Black top asphalt paving South side
2/11/2009 Irrigation well and pump box
2/11/2009 Stucco job finished under the lower roof
2/11/2009 South east corner
2/11/2009 Stucco work on south side wall
2/11/2009 South side
2/11/2009 Stucco work around the semicircular windows yet to be done
2/11/2009 FPL easement parking area
2/11/2009 Plantation road access not done yet
2/11/2009 more dirt filled and compacted
2/11/2009 North side
2/5/2009 Stucco, Electrical, Fire sprinkler, A/C, and Paving work in progress
2/10/2009
01/29/2009 Thursday Stucco work in progress. Provides a smooth surface for painting. Stucco may be used to cover less visually appealing construction materials such as concrete block.
01/29/2009 Thursday Stucco work in progress.
01/29/2009 Thursday Stucco work completed on Wednesday.
01/29/2009 Thursday Stucco work will continue tomorrow on the south side
01/29/2009 Thursday Compacting the road and parking lot around the temple building
2/1/2009 Access to Planatation road in progress
2/1/2009 Access to Plantation Road in progress
2/1/2009 Grass parking area being compacted
2/1/2009 Stucco work in progress
2/1/2009
2/1/2009 North side parking area being compacted
2/1/2009 Inside, electrical, air conditioning duct work going on
2/1/2009 Electrical wiring
2/1/2009 west side parking area
2/1/2009 Stucco complete for west wall
2/3/2009 Stucco getting completed on the east side
2/3/2009
2/3/2009 A/C duct
2/3/2009 A/C Duct
2/3/2009 Window getting prepared for installation
2/3/2009 South side stucco complete on the upper part
2/3/2009 West side view
2/3/2009 West entrance