Day 1
The basic portion of the structure was built in the driveway.
Then moved into position in the yard.
This project took FIVE DAYS at 12 hours a day. I had help from a great friend Matt H and his wife Becca who worked as hard as I did. Thanx!
Four boxes that were 250 lbs. each.
Day 2
Day 3
Day 4
Dad working hard on the roof.
Day 5
All finished. Now to water seal it!