It looks like the exterior is pretty much completed with a very elegant decorative costs on the front of our façade.
View from this angle looks almost 100% identical to the artist rendering we began with over a year ago.
Closer view of that new cross.
On the inside the walls and ceiling have been painted and floor tile is going down!
Interior view looking Northwest towards the lobby door. Note new metal covers over heating radiators.
Looking north towards what is now the rear of the church. The niche in the wall in the center will be an adoration space.
Looking northeast towards the reconciliation room.
Looking south towards the front of the church from the very rear. That is our new baptismal font wrapped in plastic in the foreground.
Finishing work still going on in the newly added section.
Some kind of electrical work going on it looks like.
This used to be sacristy area but is now going to be a storage room.
This shows the wheelchair ramp leading up the right side of the sanctuary steps. Will make it much easier for disabled parishioners to serve as liturgical ministers and to participate in the liturgy which requires them to approach the altar.
Another view of the ramp this time from the altar looking down the ramp. The emergency exit door seen in the background still needs to be installed. This area used to be the cry room.
Here is our new baptismal pool still under construction. Water will cascade out of the upper bowl into the pool below.
Work is progressing on our new gathering space. Ceiling and ductwork have been painted.
Looking through the door of the church towards the gathering space.
Another view looking towards the lobby.