Ready to start using
Passing Final Inspection
All closed up
My zenith problem solution
The bar I added to grip for turning
Another view of the rotation bar
I added blocks so it rotated smoother when it is elevated. Hot Glue works great here.
I added a hot Glue "dam" to direct water away from the possible leak points.
Both wedges. I used to 2 extra guides for the inside here.
Guide removed.
Other guide removed
Just lift one side at a time.
Initial position
Other side with low end of wedge on one side.
Wedge at starting position. Just lift a little and push the wedge in. Then repeat on other side until at desired height.
Other side in initial position
both wedges outside. note plywood pice used for outer guide. Make sre it doesn't catch on wheel axels.
Cut Curve to match POD wall Curves. I nailed a string on the plywood at the radius of the pod then drew a curve.