AUS-HY01 - Australia< Queensland - typical minor maintenance problem
CHN-HY01 - China - Fujian Province. High rainfall on this poorly stabilized slopes results in a major problem
CHN-HY02 - China- Guangdong Province because the fill slope was poorly compacted and not stabilized this major crack is developing
AUS-HY02 Australia - Queensland - typical fill stabilization problem
AUS-HY03 Australia - Queensland - typical fill stabilization problem
SPN-HY01 Spain - typical fill stabilization problem
MLA-HY01 Trials were undertaken on typical slopes and various grasses were compared and tested. In this image vetiver was compared with the best native species in Malaysia. After a heavy rainfall only vetiver (right) showed promise
AUS-HY03 Trials were undertaken on typical slopes and various grasses were compared and tested. In this image vetiver was compared with the best native species in Australia. After a heavy rainfall only vetiver (left and right) showed promise
SPN-HY02 Trials were undertaken on typical slopes and various grasses were compared and tested. In this image vetiver was compared with the best native species in Spain. After a heavy rainfall only vetiver (center) showed promise
MLA-HY02 At six months a cross section through this hedgerow was made. Vetiver roots were down 2 meters. Subsequent research showed that the average tensile strength of vetiver roots was 75 Mpa and that soil shear strength was improved by as much as 30% in the top meter
MLA-HY03 Malaysia At six months a cross section through this hedgerow was made. Vetiver roots were down 2 meters. Subsequent research showed that the average tensile strength of vetiver roots was 75 Mpa and that soil shear strength was improved by as much as 30% in the top meter
CHN-HY02 If Vetiver Systems is to be used for highway stabilization large sources of planting material are required, here is a very large 20 ha nursery in China producing bare rooted plants
MLA-HY04 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MLA-HY05 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MLA-HY06 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MLA-HY07 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MLA-HY08 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MLA-HY09 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MLA-HY10 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MLA-HY11 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MLA-HY12 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MLA-HY13 Malaysia - This is a classic fill stabilization example using VS. top quality plants, good field application, proper supervision and follow up maintenance
MAD-HY01 Madagascar - Vetiver used to stabilize the shoulder of a road
AUS-HY04 Australia, Queensland - Vetiver used to stabilize this fill slope
AUS-HY05 Australia, Queensland - Vetiver used to stabilize this fill slope
AUS-HY 06 Australia, Queensland - Vetiver used to stabilize this fill slope
AUS-HY07 Australia, Queensland - Vetiver used to stabilize this fill slope. Note these young plants at the very edge of the blacktop were affected by bitumen and fuel toxicity
AUS-HY08 Australia, Queensland - Vetiver used to stabilize this fill slope. Note these young plants at the very edge of the blacktop were affected by bitumen and fuel toxicity, but they soon recovered
AUS-HY09 Australia, Queensland - Vetiver used to stabilize this fill slope. Mature stand
AUS-HY10 Australia, Queensland - Vetiver used to stabilize this fill slope. Note these young plants at the very edge of the blacktop were affected by bitumen and fuel toxicity, but they soon recovered
AUS-HY11 Australia, Queensland - Vetiver used to stabilize this fill slope. Badly eroded fill with vetiver hedgerow
AUS-HY12 Australia, Queensland - Vetiver used to stabilize this fill slope. Badly eroded fill with vetiver hedgerow. A bit older
AUS-HY13 Australia, Queensland - Vetiver used to stabilize this fill slope. Badly eroded fill with vetiver hedgerow. mature and stable
AUS-HY14 Australia, Queensland - Vetiver used to stabilize this fill slope. Badly eroded fill with vetiver hedgerow. A new planting
AUS-HY15 Australia, Queensland - Vetiver used to stabilize this fill slope. Badly eroded fill with vetiver hedgerow. mature and stable
AUS-HY16 Australia, Queensland - Vetiver used to stabilize this fill slope. Badly eroded fill with vetiver hedgerow. mature and stable
AUS-HY17 Australia, Queensland - Vetiver used to stabilize this fill slope. Badly eroded fill with vetiver hedgerow. mature and stable
AUS-HY18 Australia, Queensland - Vetiver used to stabilize this fill slope. Badly eroded fill with vetiver hedgerow. A test site
AUS-HY19 Australia, Queensland - Vetiver used to stabilize this fill slope. Badly eroded fill with vetiver hedgerow. mature and stable
AUS-HY20 Australia, Queensland -
AUS-HY21 Australia, Queensland - Vetiver used to stabilize the edge of this road
AUS-HY22 Australia, Queensland - Vetiver used to stabilize the edge of this road. Looks nice when properly trimmed - use an industrial brush trimmer with cutting blade
AUS-HY22 Australia, Queensland - Vetiver used to stabilize the edge of this road.
CHN-HY03 In south China there has been massive infrastructure development over the past 15 years. As a result 80% of the areas sediment flows are estimated to come from sites like this. Vetiver was introduced for highway stabilization in 1997. Here a very steep fill is being plantewd with vetiver in Jiangxi Province
CHN-HY04 In south China there has been massive infrastructure development over the past 15 years. As a result 80% of the areas sediment flows are estimated to come from sites like this. Vetiver was introduced for highway stabilization in 1997.
CHN-HY05 - China - Note how vetiver stops rill cut back up this slope
CHN-HY06 - China - A nicely planted and stable fill slope
CHN-HY07 China -Jiangxi Province. Note how vetiver stops rill cut back up this slope
CHN-HY08 China -Jiangxi Province. Newly planted vetiver on a mountain road
CHN-HY09 China -Jiangxi Province. Newly planted vetiver on a mountain road
CHN-HY10 China -Jiangxi Province. A mature stand of vetiver on a fill slope. Nice job
CHN-HY11 China -Jiangxi Province. A difficult slope to protect
CHN-HY12 China - Fujian Province. Well protected slope. Previously much sediment washed from this slope on to the adjacent farm land
CHN-HY13 China - Fujian Province. Vetiver holds the shoulder of this road together
CHN-HY14 China - Fujian Province. Typical protection problem and need for VS
CHN-HY15 China - Jiangxi Province. Well protected slope. Very good growth of vetiver on this fill slope after only 2 years
CHN-HY16 China - Jiangxi Province. The soils on these slopes are very poor, even so vetiver is well established
CHN-HY17 China - Jiangxi Province. The soils on these slopes are very poor, even so vetiver is well established
CHN-HY18 - China - Guangdong Province. This fill slope had major problems and was stabilized with vetier. Gmelina trees were planted too.
CHN-HY19 - China - Guangdong Province. This fill slope had major problems and was stabilized with vetier. Gmelina trees were planted too.
CHN-HY20 - China - Guangdong Province. This fill slope had major problems and was stabilized with vetier. Gmelina trees were planted too.
CHN-HY21 - China - Guangdong Province. This fill slope had major problems and was stabilized with vetier. Gmelina trees were planted too. Two years later. within five years this slope was fully reforested
CHN-HY22 - China - Guangdong Province. This fill was initially stabilized with native grasses planted in diagonal form. doesn't work. Vetiverw as then planted as a hedgerow
CHN-HY22 - China - Jiangxi Province. Fill section
CHN-HY23 - China - Jiangxi Province. Fill section
CHN-HY24 - China - Jiangxi Province. Fill section
ELS-HY01 El Salvadore - Central America NOBS Hidrofusion introduced VS for highway stabilization in El Salvadore. As a result when tropical storm MITCH hit the country those roads stabilized with vetiver were not damaged
ELS-HY02 El Salvadore - Central America NOBS Hidrofusion introduced VS for highway stabilization in El Salvadore. As a result when tropical storm MITCH hit the country those roads stabilized with vetiver were not damaged
ELS-HY03 El Salvadore - Central America NOBS Hidrofusion introduced VS for highway stabilization in El Salvadore. As a result when tropical storm MITCH hit the country those roads stabilized with vetiver were not damaged
ELS-HY04 El Salvadore - Central America NOBS Hidrofusion introduced VS for highway stabilization in El Salvadore. As a result when tropical storm MITCH hit the country those roads stabilized with vetiver were not damaged
ELS-HY05 El Salvadore - Central America NOBS Hidrofusion introduced VS for highway stabilization in El Salvadore. As a result when tropical storm MITCH hit the country those roads stabilized with vetiver were not damaged
ELS-HY06 El Salvadore - Central America NOBS Hidrofusion introduced VS for highway stabilization in El Salvadore. As a result when tropical storm MITCH hit the country those roads stabilized with vetiver were not damaged
ELS-HY07 El Salvadore - Central America NOBS Hidrofusion introduced VS for highway stabilization in El Salvadore. As a result when tropical storm MITCH hit the country those roads stabilized with vetiver were not damaged
SPN-HY02 Spain. The first serious introduction of VS in the Medirerranean area was in Spain and tested on this fill slope. Rainfall about 350mm The site was irrigated (drip) to get the vetiver started
SPN-HY03 Spain. The first serious introduction of VS in the Medirerranean area was in Spain and tested on this fill slope. Rainfall about 350mm The site was irrigated (drip) to get the vetiver started
THA -HY01 VS has been used for highway fill stabilzation in Thailand with a great deal of success
China- Vetiver root. This is what holds it all together.
Highway in Guangdong - advisor and landscaper
Highway in Guangdong - Before
Highway in Guangdong - at planting
Highway in Guangdong - at 2 months
Highway in Guangdong - at 6 months
Highway in Guangdong - at 1 year
China- Nanjing Highway with VS Three years after planting