Heading into down town San Francisco from the Bay Bridge
View from the San Francisco Bay Bridge. Nice clock tower.
Steel moment Frames extending to the third floor.
San Francisco Bay Bridge 6:00 AM commuter traffic. Get in Line!
The end of our drouth. Lots of rain today.
1" clearance at the property line.
Steel I beam x bracing on the first floor.
Under ground parking. Or under ground swimming pool?
Get the pumps working.
Stell x bracing with lumber attached.
Vull Crafter steel joist with metal decking. With 3 1/2" concrete on top of the steel decking.
More X bracing.
More rain today. It's flooding the under ground parking garage.
Double party wall with X bracing.
Concrete and more concrete.
More first floor X bracing.
Still more X bracing on the first floor.
Ready to frame the second floor.
Court yard property line party wall framed.
Digging out the under ground parking garage.
Still digging out the under ground parking garage.
Steel decking installed over the under ground parking garage.
Checking the LVL joist rim board for the required 6" O.C. nailing.
This house needs a little help.
Level the window. The hell with leveling the siding.
All the houses are ready to fall down.
Checking the 4" O.C. shear nailing on the property line party walls.
LTP4 nailed to the top plate and LVL joist rim before we lift the walls.