West Pier - 03/07 - Lowering pump into Shaft 4W
West Pier - 03/07 - Drilling Shaft 4W
West Pier - 03/07 - Mini-SID (shaft inspection device) being lowered into Shaft 4W
West Pier - 03/07 - Sonar inspection device
West Pier - 03/07 - O-cells and base grouting plate at bottom of rebar cage of Shaft 4W
West Pier - 04/07 - Concrete line
West Pier - 04/07 - Concrete pump and slick line
West Pier - 04/07 - Concrete placement
West Pier - 04/07 - Pulling casing
West Pier - 04/07 - Pulling tremie pipe from a shaft
West Pier - Preparing to lift rebar cage for Shaft 1W
East Pier - 04/07 - Vibrating casing
West Pier - 07/07 - Downhole hemispherical grab at Shaft T4
West Pier - 07/07 - Adding casing at Shaft T4
West Pier - 08/07 - Oscillator and template at Shaft T4
West Pier - 07/07 - Concrete placement at Shaft T4
West Pier - 07/07 - Dr. Steve Dapp, P.E. at West Pier (Looking sharp!)
West Pier - 08/07 - Concrete placement Shafts T3 and T4
West Pier - 08/07 - Preparing for concrete placement at Shaft T4
West Pier - 08/07 - Load test Shaft T3 - An O-Cell test with an added conventional jack and reaction frame at the top to provide additional resistance.
West Pier - 08/07 - Setting up for tip grouting Shaft T4
West Pier - 08/07 - Tip grouting Shaft T4
West Pier - 08/07 - Rebar cages at Shafts T3 and T4
West Pier - 08/07 - Tip grouting Shaft T4 (left) and load test Shaft T3 (right)
West Pier - 08/07 - Shading test sites Shafts T3 and T4
East Pier - 04/07 - CSL testing in Shaft 11E
East Pier - 04/07 - Grout pump for tip grouting at Shaft 11E
East Pier - 04/07 - Monitoring tip grouting of Shaft 11E
East Pier - 04/07 - More tip grouting at Shaft 11E
West Pier - 03/07 - Removing casing and oscillator at Shaft 4W
West Pier - 03/07 - West Pier work area
West Pier - CSL testing at Shaft 1W
West Pier - Ready to tip grout at Shaft 1W
East Pier - 11/07 - Work at Shaft 16E
East Pier - 11/07 - Clean out of Shaft 16E
East Pier - 11/07 - Lowering casing brush into Shaft 16E
East Pier - 11/07 - Sampler fabricated to obtain samples in bottom of Shaft 16E
East Pier - 11/07 - Lifting sampler into Shaft 16E
East Pier - 11/07 - Sample catcher in tip of sampler
East Pier - 11/07 - Drop sampler fabricated for use in Shaft 16E
East Pier - 11/07 - Lowering drop sampler in Shaft 16E