It cost a bloody lot!!! So it better feel good.
Completed back right window frame and upper section of lining.
Front windows removed and framing installed
New framing being installed
New panels fitted to right hand side
Front right hand panel fitted, window cut out made
New window in dinning area
Trimming new and old panels
RHS Slide out removed to allow fitting of seals
RHS Slideout removed and seal strips being fitted
Body modificatons completed and reaires primed ready for patching of the floor
While removed for seal fitting the internal panels were undersealed
Floor repair underway in area of RHS slide out cut out.
Seal joint RHS top left
Dianne tapping seal into place
RHS Slide out ready for lining. (Is extended)
RHS S/O - 24v lighting and speaker cables installed.
RHS Slide out upper stopper plate - weather seal is in place behind it
Right hand slide out, completed, primmed and back in the hole complete with seals
RHS Front Leveling leg - yes I was playing when I was painting something else. Note the valves are there for a saftey device if you wish to use the legs to lift the MH off the ground to do a wheel change.
Finaly - Space!!! Until the BBQ gets fitted to this locker
RHS Rear level ram.. Exhaust and muffler needed removed for mounting, however only a small mod to the muffler heat sheld was needed before putting it all back in. Exhaust will remain off untill instalaltion is completed.
LHS Front leveling ram - note the fuel tank had to be shortened by 150mm to give room.
There is a real story behind these 2. But in the end its all good. These panels and the rams are all genuine "Bigfoot" parts. However the control hydrolic system is a Hybrid.
3 from Trademe and 1 from Ebay..These solinoids will control the leveing legs.
RHS Front slide out seal, in the extended posistion.
Kitchen Slide Out. Showing holding tank (20l max) and pump.
Sometimes the only way to work it out is to mock it up...
Hot and cold supply, centre is the hot water flush return. Valves supply the outdoor shower
Power control panel getting there slowly
Start of the oven "Box"
Left hand cupboard, drawers in place along with rubbish bin
Oven trial fit
Di saving the parts off the old coach switch panel
I guess he wants these things off as well!!
Booth seating area, framwork behind is storage.
Sprinkler head and heat detector behind the fridge
Rear booth seat
Front booth seat
The TV is only temporary
TV slide rails
TV Slide bracket - note the ball jont in the middle
Slide bracket end bearings
Slide bracket top view
Back of TV
TV Sliding bracket in posistion
TV box and frame
All stained and ready to go
The finished product - (in rear posistion)
At the front
Closed up
Table window, and is also an exit.
Finaly we have the seats fitted.
Slide out trim, this is a test piece to check sizes
Same corner
Looking towards the back, ready for the lining to start
Conduits down the wall. The ones on the right have a space for the level controller to go between them.
Right side is on, left side ready
Power board is now covered.
Di is appling the sealer to the wall board. This makes gluing a lot easyer to do
Another shot of the underside..
"CV BOOT" seal on the panel lifter.
Water cooler
Now this is all "My idea". Its a water cooler. Feed by a filter and out to a drinking water tap on the counter top.
Looking from the front. These tanks were stand size...and only "just" fitted.
Tanks support framework below. Note the grey tank is installed. The grey and 2 white tanks side in from the front.
This was the first raise of the solar panel frame
Roof lining is now in, and the lights fitted.
RHS lining "pinned" in posisition
Glued top to middle
All of top glued
Side lining completed, seats and window fram in posistion
Starting to look good Ay?
RHS Slideout lined top and sides
Slideout lining completed
Lights fitted and trial trim corner
Yes they are big but the price was right :) These are 8 of the 12, 2volt cells
And its off to the painters we go